The casing may well extend to The full depth or may perhaps terminate higher than the bond zone, Along with the reinforcing bar continuing to the full depth. and drinking water. Sand may also be added According to structure requirements to lower the general Value. The micro piles are divided https://prefabricatedbathroom04703.blogpixi.com/31837318/piling-fundamentals-explained