As seen from your figure down below, steady auger is utilized to drill the borehole, raise up drilled soil, and pour concrete while the auger is moved up. As a result, the borehole would not need to have casing or hydrostatic stress to circumvent damage to the borehole wall. The https://williamb008dlf7.blogdemls.com/profile