If one of those standards is discovered to obtain a significant deficiency, the contractor’s overall system is considered to generally be unacceptable. In such cases, not just should the contractor get consent to subcontract, in accordance with DFARS 252.242-7005, which is necessary to get included in CAS coated contracts that https://contractor-purchasing-sys08393.qowap.com/92943927/the-definitive-guide-to-contractor-purchasing-system-review