1

Penmann finalises major HVAC upgrade for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann recently finalised a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, providing a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production criteria. The contract covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High https://infopagex.com/story6063933/penmann-ltd-finalises-major-hvac-upgrade-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story